GHSA-98J2-6V39-78W8

Vulnerability from github – Published: 2026-08-08 03:31 – Updated: 2026-09-18 17:37
VLAI
Summary
Bouncy Castle: Zeroisation of sensitive key material on garbage collection relies on finalization.
Details

In Bouncy Castle for Java FIPS (BC-FJA) before bc-fips 1.0.2.7 (1.0.X series), 2.0.2 (2.0.X series) and 2.1.3 (2.1.X series), sensitive key material held by the AES and DESede engines, the SP 800-90A DRBGs, SymmetricSecretKey and the PBKD and scrypt parameter classes was zeroised on garbage collection by overriding Object.finalize. Finalization runs at an unspecified time and in an unspecified order and is serviced by a single finalizer thread, so where objects carrying a finalizer are allocated faster than that thread retires them the pending-finalization queue grows without bound: disposal falls arbitrarily far behind, which can contribute to an OutOfMemoryError under load, and the key material those objects hold stays resident in the heap for as long as they are queued, defeating the purpose of the zeroisation. The behaviour was not a problem on Java 8 or Java 11; it is later JVMs, on which finalization has been deprecated and progressively de-emphasised, where it becomes one. Disposal of these classes now runs from a java.lang.ref.Cleaner registered in the multi-release jdk1.9 overlay, so on Java 9 and later it no longer depends on the finalizer being scheduled. Bouncy Castle for Java (bcprov) and Bouncy Castle for Java LTS are not affected, as neither implements the finalizer-based zeroisation scheme.

Show details on source website

{
  "affected": [
    {
      "package": {
        "ecosystem": "Maven",
        "name": "org.bouncycastle:bc-fips"
      },
      "ranges": [
        {
          "events": [
            {
              "introduced": "0"
            },
            {
              "fixed": "1.0.2.7"
            }
          ],
          "type": "ECOSYSTEM"
        }
      ]
    },
    {
      "package": {
        "ecosystem": "Maven",
        "name": "org.bouncycastle:bc-fips"
      },
      "ranges": [
        {
          "events": [
            {
              "introduced": "2.0.0"
            },
            {
              "fixed": "2.0.2"
            }
          ],
          "type": "ECOSYSTEM"
        }
      ]
    },
    {
      "package": {
        "ecosystem": "Maven",
        "name": "org.bouncycastle:bc-fips"
      },
      "ranges": [
        {
          "events": [
            {
              "introduced": "2.1.0"
            },
            {
              "fixed": "2.1.3"
            }
          ],
          "type": "ECOSYSTEM"
        }
      ]
    }
  ],
  "aliases": [
    "CVE-2026-13505"
  ],
  "database_specific": {
    "cwe_ids": [
      "CWE-772"
    ],
    "github_reviewed": true,
    "github_reviewed_at": "2026-09-18T17:37:30Z",
    "nvd_published_at": "2026-08-08T02:17:16Z",
    "severity": "HIGH"
  },
  "details": "In Bouncy Castle for Java FIPS (BC-FJA) before bc-fips 1.0.2.7 (1.0.X series), 2.0.2 (2.0.X series) and 2.1.3 (2.1.X series), sensitive key material held by the AES and DESede engines, the SP 800-90A DRBGs, SymmetricSecretKey and the PBKD and scrypt parameter classes was zeroised on garbage collection by overriding Object.finalize. Finalization runs at an unspecified time and in an unspecified order and is serviced by a single finalizer thread, so where objects carrying a finalizer are allocated faster than that thread retires them the pending-finalization queue grows without bound: disposal falls arbitrarily far behind, which can contribute to an OutOfMemoryError under load, and the key material those objects hold stays resident in the heap for as long as they are queued, defeating the purpose of the zeroisation. The behaviour was not a problem on Java 8 or Java 11; it is later JVMs, on which finalization has been deprecated and progressively de-emphasised, where it becomes one. Disposal of these classes now runs from a java.lang.ref.Cleaner registered in the multi-release jdk1.9 overlay, so on Java 9 and later it no longer depends on the finalizer being scheduled. Bouncy Castle for Java (bcprov) and Bouncy Castle for Java LTS are not affected, as neither implements the finalizer-based zeroisation scheme.",
  "id": "GHSA-98j2-6v39-78w8",
  "modified": "2026-09-18T17:37:30Z",
  "published": "2026-08-08T03:31:12Z",
  "references": [
    {
      "type": "ADVISORY",
      "url": "https://nvd.nist.gov/vuln/detail/CVE-2026-13505"
    },
    {
      "type": "PACKAGE",
      "url": "https://github.com/bcgit/bc-java"
    },
    {
      "type": "WEB",
      "url": "https://github.com/bcgit/bc-java/wiki/CVE%E2%80%902026%E2%80%9013505"
    }
  ],
  "schema_version": "1.4.0",
  "severity": [
    {
      "score": "CVSS:4.0/AV:N/AC:L/AT:N/PR:N/UI:N/VC:N/VI:N/VA:H/SC:N/SI:N/SA:N/U:Amber",
      "type": "CVSS_V4"
    }
  ],
  "summary": "Bouncy Castle: Zeroisation of sensitive key material on garbage collection relies on finalization."
}



Log in or create an account to share your comment.




Tags
Taxonomy of the tags.


Loading…

Loading…

Loading…

Drag nodes to arrange them. Double-click a related vulnerability to open it, or a source to visit its link. The Physics button on the left tunes the layout and the simulation; the legend at the bottom left hides or shows nodes by kind and by sighting type.

Forecast uses a logistic model when the trend is rising, or an exponential decay model when the trend is falling. Fitted via linearized least squares.

Sightings

Author Source Type Date Other

Nomenclature

  • Seen: The vulnerability was mentioned, discussed, or observed by the user.
  • Confirmed: The vulnerability has been validated from an analyst's perspective.
  • Published Proof of Concept: A public proof of concept is available for this vulnerability.
  • Exploited: The vulnerability was observed as exploited by the user who reported the sighting.
  • Patched: The vulnerability was observed as successfully patched by the user who reported the sighting.
  • Not exploited: The vulnerability was not observed as exploited by the user who reported the sighting.
  • Not confirmed: The user expressed doubt about the validity of the vulnerability.
  • Not patched: The vulnerability was not observed as successfully patched by the user who reported the sighting.
Vulnerability timeline

Sightings and recorded dates, grouped by day · UTC

JSON
How durations are calculated

Following the VTEM framework (Black Hat USA 2015), time to patch starts when the vendor or a coordinator was informed, total time to patch at discovery, and disclosure to patch at public disclosure; vendor response time runs from the report to its acknowledgement. Time to exploit and time unpatched start at the earliest discovery or report, falling back to public disclosure. Unpatched time ends at the first recorded patch, or the calculation time when no patch is recorded. Exploitation to patch shows the interval between those two events; a published proof of concept is a public exploit, not exploitation.

Each result shows its source dates. A negative interval means the end event came first; when date-only inputs leave the order open, the result says so. Date-only inputs are approximate. The earliest evidence wins: KEV report dates and sightings are labelled as such. Records describing another vulnerability are listed but never calculated from, and a PoC alone does not establish exploitation. Missing patch evidence does not prove that no patch exists. Filters below change the event list only.

Events included in the timeline

Loading timeline…


    Loading…

    Loading…

    Loading…

    Related by attack behaviour

    Vulnerabilities whose description is nearest to this one in the vector space of the CIRCL/vulnerability-attack-technique-biencoder model. This is a similarity search over the bi-encoder space (plain cosine), not a classification, and it has no measured accuracy.